CPS Energy failed to tell public true nuke estimate

South Texas Project

Nice scoop by Anton Caputo and Tracy Idell Hamilton:

CPS Energy knew a year ago that contractor Toshiba Inc. wanted at least $4 billion more than San Antonio was willing to pay for the nuclear expansion, according to several sources close to the deal.

Despite this, utility officials used a much lower figure as they pitched the project at public meetings during the summer, arguing that nuclear was the most cost-effective way for San Antonio to meet its future energy needs.

Share and Enjoy:
  • email
  • del.icio.us
  • Digg
  • Facebook
  • Diigo
  • Fark
  • MySpace
  • Reddit
  • Slashdot
  • StumbleUpon
  • Twitter
  • Technorati

Tags: , , ,

Leave a Reply (comment guidelines)

Additional comments powered by BackType